Which almost never happens, design changes are part of the process, as has been said before, projects of this size very rarely finish on schedule, most are behind before a spade hits the ground and a 4-5 month delay as spurs are seeing is not to bad in the grand scheme. Anyone who thinks we won’t have design issues on this site are crazy, I also think the capacity will be very much dictated by the constraints of the site and the delays will be down to how a lot of the surveys have returned issues with how it can be constructed, piling issues etcSpurs are paying the price of design changes during the construction phase. If we design it properly, and don't make changes once the Main Contractor is on site, then we reduce the risk of delays and cost increases. You'll never eradicate it, but you can reduce the risk.
Long road ahead, but hopefully at last a real desire and capable people on board to get it done