James Patrick
Player Valuation: £5m
Each floor level needs a concrete pour as the stadium rises. Also theres the exposed concrete roof sections at South End and the 2nd floor concourse at North End for starters. Loads of concrete pouring needed on west stand plaza and waterway area.I am no builder, but where would concrete be needed now? The brickwork is off site, panel things, same with the terraces being pre cast, off site. Pretty much all the ground works would be done ages ago.