Isn't the handover date 11 November with Everton to takeover responsibility for whatever needs doing afterwards? I'm assuming the club haven't publicly committed to a 'final' completion date and not sure we'd notice the difference externally, anyway.
The Everton Way stones will be the only visible work we will see externally.
Will there be a concrete base covering the whole area where the water will be, like the small section they have already created otherwise the water could sink under the sand and possibly under the stadium or is that wall they created going all the way down to the bottom of the dock, if that makes sense?
I would doubt it, if there was going to be a full concrete floor it would have been done in smaller pours like the first part closest to the piles.
That part will stop the water undermining in that area and I guess they aren't worried about the mid channel section.