MrGrumpy
Player Valuation: £50m
3 years they expect it to be built inWhat's the best / most optimistic timeline for this to open? I need to get to Goodison before that...
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
3 years they expect it to be built inWhat's the best / most optimistic timeline for this to open? I need to get to Goodison before that...
Sake, The only wildlife down there was 3 bells in the morning when the Hard dock was openThey where, a lot of questions based on wildlife
With us moving to BRAMLEY Moore Dock, will we be called 'The Toffee Apples'?
Some guy asked if we can make more cycle parking and make sure all parking spaces where electric charging points. They said they canSake, The only wildlife down there was 3 bells in the morning when the Hard dock was open
Potentially about 70 more games at Goodison before the old lady is laid to rest.Season 2023-2024 Champions saying goodbye to a place that has given me some amazing memories.
Oh how about another euro semi again, get the old lady rocking like no other place in England.
It’s took 4 and a half to get to this point so I don’t expect it before 2025 myself, all depends how quick things move now.3 years they expect it to be built in
Basically a rubber stamp job then.My partner works for MHCLG.
She 100% doesn't think he will can the stadium. They defer to local decisions in the main.