Funnily enough, seeing that update about the concrete in the west stand, I was told this week, by someone who knows someone on-site (I know, I know, could be rubbish); that there’d been a problem with the concrete setting in places, which had put the build back to the scale of a month or 2.
However that delay was built into their overall position on potential slippage due to unforeseen site problems, so wouldn’t affect the final completion date I.e plenty of other stuff to get on with in the meantime.
Could be BS of course, but those pictures from the design docs showing the week 50 position did seem to have it further along than we are at this point (not far off 50 weeks now I think), so could be some truth in it.
However that delay was built into their overall position on potential slippage due to unforeseen site problems, so wouldn’t affect the final completion date I.e plenty of other stuff to get on with in the meantime.
Could be BS of course, but those pictures from the design docs showing the week 50 position did seem to have it further along than we are at this point (not far off 50 weeks now I think), so could be some truth in it.