Install the app
How to install the app on iOS

Follow along with the video below to see how to install our site as a web app on your home screen.

Note: This feature may not be available in some browsers.

 

New Everton Stadium

They're not ahead of schedule according to that. Beginning of June shows East stand barrel roof partly installed along with half the cantilever sections on the West stand.

There's also all the steelwork in place for the lower section of the North stand.

View attachment 212352

I'd take that with a pinch of salt anyway as we've no idea how things are progressing internally. That's where there could be significant delays.

The stadium isn't going to be ready for occupation come August 2024, that much is certain.
Is that beginning of June or end from the plans and steel shown isn’t the lowest part that which you can see is already covered with concrete terrace.
Agree with internals but not sure either way 🤷🏻‍♂️ I remain optimistic 🙏
 
They're not ahead of schedule according to that. Beginning of June shows East stand barrel roof partly installed along with half the cantilever sections on the West stand.

There's also all the steelwork in place for the lower section of the North stand.

View attachment 212352

I'd take that with a pinch of salt anyway as we've no idea how things are progressing internally. That's where there could be significant delays.

The stadium isn't going to be ready for occupation come August 2024, that much is certain.

These things are planned to the very detail of every nut and bolt literally, I know because I work in this industry.

There is already lots going on internally in all the stands from power, electricity, fire control systems, CCTV and catering that has started and is happening in parallel to the building externally.

They are saying it’s ahead of schedule so who knows but I can’t see it ready for August 2024 perhaps a move in the middle of the season would be more realistic.
 

Are there any images online to how this stadium compares to others in the EPL? Like an overlay for example to see just how big it is.
I think these were from the plans when it was going to be a 60,000 seater and the changing rooms
 

Attachments

  • IMG_1437.webp
    IMG_1437.webp
    109 KB · Views: 155
  • IMG_1436.webp
    IMG_1436.webp
    133.5 KB · Views: 140
  • IMG_1435.webp
    IMG_1435.webp
    81.6 KB · Views: 144
  • IMG_1434.webp
    IMG_1434.webp
    94.9 KB · Views: 152
  • IMG_1454.webp
    IMG_1454.webp
    61.9 KB · Views: 156
These things are planned to the very detail of every nut and bolt literally, I know because I work in this industry.

There is already lots going on internally in all the stands from power, electricity, fire control systems, CCTV and catering that has started and is happening in parallel to the building externally.

They are saying it’s ahead of schedule so who knows but I can’t see it ready for August 2024 perhaps a move in the middle of the season would be more realistic.
They're not trying to get it ready for August 2024 though - that's not the timetable.
 


Welcome to GrandOldTeam

Get involved. Registration is simple and free.

Back
Top