Wouldn't worry about it. We've got 99 problems, but the pitch ain't one.
That would be a belter song to play at the opening ceremony
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Wouldn't worry about it. We've got 99 problems, but the pitch ain't one.
Is that beginning of June or end from the plans and steel shown isn’t the lowest part that which you can see is already covered with concrete terrace.They're not ahead of schedule according to that. Beginning of June shows East stand barrel roof partly installed along with half the cantilever sections on the West stand.
There's also all the steelwork in place for the lower section of the North stand.
View attachment 212352
I'd take that with a pinch of salt anyway as we've no idea how things are progressing internally. That's where there could be significant delays.
The stadium isn't going to be ready for occupation come August 2024, that much is certain.
Wouldn't worry about it. We've got 99 problems, but the pitch ain't one.
Post of the year so far.Wouldn't worry about it. We've got 99 problems, but the pitch ain't one.
They're not ahead of schedule according to that. Beginning of June shows East stand barrel roof partly installed along with half the cantilever sections on the West stand.
There's also all the steelwork in place for the lower section of the North stand.
View attachment 212352
I'd take that with a pinch of salt anyway as we've no idea how things are progressing internally. That's where there could be significant delays.
The stadium isn't going to be ready for occupation come August 2024, that much is certain.
I think these were from the plans when it was going to be a 60,000 seater and the changing roomsAre there any images online to how this stadium compares to others in the EPL? Like an overlay for example to see just how big it is.
That's the one I was on about.I think these were from the plans when it was going to be a 60,000 seater and the changing rooms
Gana might actually be back here for the first game. Shows how long this has been going on, you forget it was under consultation and planning for years.I think these were from the plans when it was going to be a 60,000 seater and the changing rooms
They're not trying to get it ready for August 2024 though - that's not the timetable.These things are planned to the very detail of every nut and bolt literally, I know because I work in this industry.
There is already lots going on internally in all the stands from power, electricity, fire control systems, CCTV and catering that has started and is happening in parallel to the building externally.
They are saying it’s ahead of schedule so who knows but I can’t see it ready for August 2024 perhaps a move in the middle of the season would be more realistic.
Mine is better..View attachment 212436View attachment 212437View attachment 212438
People seen this? From Dan Meis twitter. ....
View attachment 212436View attachment 212437View attachment 212438
People seen this? From Dan Meis twitter. ....
View attachment 212436View attachment 212437View attachment 212438
People seen this? From Dan Meis twitter. ....