Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
If there's going to be a running track, temporary or not, then surely it's designed for athletics.Why would we want to change the design, when it's not being designed for athletics, nor is the design being compromised in any way?
Do you deny climate change exists too, and think the earth is flat?
Swear you're on a wind up.
Meaning no steep stands behind a goal or any stand.
It's not possible that any design which incorporates a track, doesn't compromise the design.
A crappy little photoshop/paint job that serves the purpose of explaining how our stadium will look like before, during and after the Commonwealth Games:
Ha Ha Ha.A crappy little photoshop/paint job that serves the purpose of explaining how our stadium will look like before, during and after the Commonwealth Games:
Swimmy badges.Are people seriously calling the architect a liar?
What makes you qualified to call a world renowned architect a liar?
Ha Ha Ha.The pitch in dortmund is 105m long.
Athletics track is 177m long.
That means the track extends 36m up both end stands. ie more than halfway.
Let them bitch on then internet. They're irrelevant to the design process and once complete, the answers will be clear to see.Are people seriously calling the architect a liar?
What makes you qualified to call a world renowned architect a liar?
Yeah, and I also said 4 steep stands, 58000 capacity and no running track.
One of these things has already come true. As will the other two.
@tommye