efc1111
Player Valuation: £500k
I've only seen the pictures, has there been a time frame for when this is expected to be done and finished?
In time for the start of the season, apparently
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I've only seen the pictures, has there been a time frame for when this is expected to be done and finished?
If that's true that's incredible.In time for the start of the season, apparently
The tower is probably just scaffolding covered in cladding.If that's true that's incredible.
or massive JengaThe tower is probably just scaffolding covered in cladding.
So, tower 3 blocks out Castle Greyskull ??
The first paragraph of the brief says it all with regard to short term solution while the new stadium gets builtFrom the application. Bit more detail here, the big rainbow banner is actually a proposed LED banner. The third (new) "tower" is just a framework but with the option to build into/onto it in the future (presumably when the dockside arena goes tats up, FFS Everton)
2016-06-13 CLA - Design and Access Statement(1).pdf
MOSHIRI OUT FFS BRING BACK KENWRONGFrom the application. Bit more detail here, the big rainbow banner is actually a proposed LED banner. The third (new) "tower" is just a framework but with the option to build into/onto it in the future (presumably when the dockside arena goes tats up, FFS Everton)
2016-06-13 CLA - Design and Access Statement(1).pdf
If that's true that's incredible.
i still have an old Everton mentality. When told something will take a few months i expect years. it will take me a while to get use to all this efficiencyWhy, they are just wrapping 3 sides of the ground in PVC, building an Empty tower and putting fancy new lights on top and around it all. Very cosmetic yet will no doubt look very smart, but shouldn't really take much time to do.......
From the application. Bit more detail here, the big rainbow banner is actually a proposed LED banner. The third (new) "tower" is just a framework but with the option to build into/onto it in the future (presumably when the dockside arena goes tats up, FFS Everton)
2016-06-13 CLA - Design and Access Statement(1).pdf
i still have an old Everton mentality. When told something will take a few months i expect years. it will take me a while to get use to all this efficiency