Also, its pretty cool that Laings and the club have asked him to stay off site, so to speak, on weekdays, which is kinda tacit approval.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
love this photo. Shows how the stadium design should be well suited to the surrounds.
Hope he did a blue poo.....Another "defecatory incident," by a Liverpool supporter.
Craven Cottage is a damn good location, but I think BMD will be even better, especially once the surrounding area / PEEL development is finally completed. It’s going to be an incredible waterfront city skyline.I can't think of another stadium that has a better location. It will truly be an iconic addition to an already stunning waterfront. We are very lucky - but we've all been through some hard times to get here - so I think we deserve this.
Roof trusses being assembled on site an going up within four weeks.
@Connor First sentence ,Bang on schedule.
Not sure why there would be a need to say it tbh.They're not going to say differently, Lou
Not sure why there would be a need to say it tbh.
Couple of site lads in Costco a week or 2 ago where saying it was ahead of schedule.
Coming along great strides .
I like Craven Cottage too. The new stand sits well on the riverside.Craven Cottage is a damn good location, but I think BMD will be even better, especially once the surrounding area / PEEL development is finally completed. It’s going to be an incredible waterfront city skyline.
Ah well we'll see soon enough.Lads I know working on it have got a date that it'll be handed over and it is way behind what everyone was told at first
Lads I know working on it have got a date that it'll be handed over and it is way behind what everyone was told at first
It'll be on programme...just a revised one based on when they actualy started on site!
It's a minimum three year build time so given we started in August 2021 that takes us to August 2024 assuming no delays (which there will be at some point).
There will also be a period of testing and commissioning etc plus time needed for the club to transition over, train staff etc etc.
It won't be ready for the start of the 24-25 Season, some time early 2025 I expect.