NathDogg
Player Valuation: £40m
Muchas Gracias amigo.lol Bravo lol
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Muchas Gracias amigo.lol Bravo lol
Upper East stand in purely geographic terms!Trying to work out what will be the new Upper Bullens.
The best speck in Goodison.
Upper East stand in purely geographic terms!
Upper East stand in purely geographic terms!
You are of course right but something more akin to the view would be mid to upper lower tier, that would give you the height of the upper Bullens and also pull you in a bit closer. However nowhere near as close as people are currently.
Yes, quite correct.You are of course right but something more akin to the view would be mid to upper lower tier, that would give you the height of the upper Bullens and also pull you in a bit closer. However nowhere near as close as people are currently.
Iconic Everton Stadium Roof Undergoes Weather Testing
Latest news from Everton Football Clubwww.evertonfc.com
I may have spotted a design flaw there my son.They're possibly measuring between brick facades for the perforated metal rainscreen panels.
It’s got to be particularly brutal down there at the docks, it’s basically the sea so it won’t be a million miles off the exposure something like a ferry has to deal with.Mad isn't it the details that go into the design and how things get tested and for what.
It’s got to be particularly brutal down there at the docks, it’s basically the sea so it won’t be a million miles off the exposure something like a ferry has to deal with.
I do worry that the gleaming white steel is going to be streaked with orange inside a few short years.
That's what they are literally described as in the Construction Plan:I may have spotted a design flaw there my son.
God bless.
Everton thatThat's what they are literally described as in the Construction Plan:
5.7 Stage 7 – Facade
The lower facade works (L0 to L3) to the West, East, South and North stands consist of:
Architectural brick clad precast piers, either stacked or hung from the structural frame.
Spaces between brick piers will be infilled with perforated metal rainscreen panels to upper levels.
East and West elevations contain a large rainscreen portal entrances with curtain wall glazing frontage.
The L3 accommodation above brick clad envelope is a mix of storey height curtain wall glazing and
rainscreen.