tommye
Player Valuation: Ā£100m

Beautiful mate.
Everyone's gonna hate us even more when it's finished
My pleasureOnly got to your first comment, loving it Noggsy![]()
they're watching this thread and pulling our pi$$er
it looks magnificent in the low sunshineMore seats incoming and trying out the Wi-Fi !
Suspect they are just further ahead with the North Stand which is where they were testing.Looks amazing.
Really surprised at some of the sequencing of work though.
Testing the Wi-Fi in the bowl but the ground floor internal MEP fit out didnāt even look like the containment was is in yet where all the hanger were dangling from the soffit.
Itās either a lot closer to āstaticā completion than it looks (ie approaching commissioning which Iād expect to be 4-6months) or theyāre doing some off the wall programme / construction scheduling.
Hope they had an entire team of dozens testing the Three signal, coz I sure as hell can't get a signal in Goodison. And how else am I going to be able to ignore what's going on the pitch if I don't have a signal?
Never mind all the other stuff, that's the priority!