Two Teams For Football Stadium Upgrade
Two leading firms in their respective fields have teamed up to provide an enhanced home for Everton Football Club.
Merseyside Galvanizing and Shawton Engineering Ltd have fabricated and galvanized steelwork which has been used to create a walkway to access, install, and maintain new floodlighting at Goodison Park. With a capacity for 40,221 fans, the new floodlights were installed to enable the stadium to meet FA criteria.
Paul Hiscock, Contracts Manager at Shawton Engineering Ltd, explained: "We called upon our long-standing partners, Merseyside Galvanizing, to provide their hot dip galvanizing treatment to around 50 tonnes of steel, as our client required a long-term protection and the need for little or no maintenance. This is especially important as the structures are based outdoors and are open to all kinds of British weather."
Looks like new stadium seems in the distant future.