Is that defo the case? I wondered if that was why Moshiri’s quoted costs went up, originally quoting Cat B fit out (LoR) and then upping with Cat C / FF&E costs (a n other), but seeing as elements of the bars and changing rooms are being done under LoR I wasn’t sure if they’re doing a full turn key build or not.
As I understand it there is still FF&E to complete following handover, i've no idea what is involved but by all accounts there still around £50m plus required for works post LoR. I'm wondering whether the club are picking up all the hospitality areas through a specialist sub-contractor and letting LoR complete the General Admission?
 


Nice!

178670ff7706b1ab6bcb21ccaf187557.gif
 
Report it to the club. Last thing we want is that being clad over and left there.

There will be cameras all over the site so hopefully LoR will be able to pin point the whopper who did it and sack him.

I'm sure there will be other stuff that will come out once it's finished.
Petty and childish from the person responsible and I’m all for it to be honest.

Just imagine the shenanigans the majority of us would get up to if we were working on their gaff.
 

Petty and childish from the person responsible and I’m all for it to be honest.

Just imagine the shenanigans the majority of us would get up to if we were working on their gaff.
I’d have to spend more on hot water and soap washing myself 21 times a week than I’d earn in the week working on their gaff
Which as we all know is our first ground which we donated to them
 