Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
£300m?
He's on crack
In construction projects of this scale, any cost referred to in advance is an estimate at best. You can expect whatever figure is mooted now to be significantly lower than the eventual bill.
£300m?
I thought we were getting a world class venue that would be the envy of the league?
Surely we haven't been lied to again![]()
£300m?
I thought we were getting a world class venue that would be the envy of the league?
Surely we haven't been lied to again![]()
So that Buro Happold brochure that had to be removed from here was genuine then!
Yes, that design spec was sufficiently detailed and had clearly had detailed project management / technical input that it is a very close approximation of what we will eventually see. Assuming we aren't relegated.Don't think that was ever in any doubt. It looked detailed and genuine and the fact it had to be removed was a bit of a clincher.
For those who haven't seen said document
http://www.blueheartbluesoul.com/le...on-are-aiming-big-with-their-new-stadium.html
Unsure if posting a link circumvents the removal (admins feel free to take down if required)
300 million will buy you a lot of 4x2... i'm expecting something half decent.
It was never going to be a decked out with the highest quality materials, think more the Millennium Stadium rather than Wembley.
£300m for a 60k seater would mean a really high quality finish